130m-tall tower topples in planned demolition

A massive 130m (426ft) boiler house was brought down in a controlled demolition in Hohenhameln-Mehrum, Germany, on November 7.

Footage captures the dramatic collapse of the former power plant structure. A new gas-fired facility is planned for the site.

#Germany #BuildingDemolition #ControlledDemolition

Related posts

Leave a Comment